Planning a new build, renovation, or extension in Canberra?

A bathroom or kitchen upgrade usually runs 3–6 weeks. Add a second storey and you’re looking at 3–5 months. A full custom home lands around 8–12 months. The catch? Most of the lost time happens before trades arrive—missing one ACT approval step can push everything back by weeks. Lock in the paperwork early and you keep the schedule (and budget) on track.

How long will your Canberra build or renovation really take?

Know each step and who owns it so your schedule stays tight.

Do I need council approval?

If any work changes the exterior or touches the structure, you almost always need approval through the ACT Planning and Land Authority. Even some internal jobs need sign off. Check the ACT Planning Portal or ask us early and we will confirm what applies.

Who should I speak with first, architect or builder?

For simple cosmetic updates, start with a builder. If you plan to move walls, add rooms or change the layout, talk to an architect or designer first. The key is to get clarity on what is possible and sensible before anyone starts drawing or quoting.

Should I move out during the works?

For small jobs like painting or tiling you can usually stay put. For major work such as kitchen, bathroom or structural changes, moving out speeds things up and keeps daily life sane. Some families stay with relatives, others rent nearby. Plan for it early.

What should I renovate first?

Focus on the spaces you use most and that add value: kitchens, bathrooms and living areas. If the project is large, break it into phases. Finish the high impact areas first, then tackle the rest when budget and time allow.

Frequently Asked Questions: Renovating in Canberra

Thinking about renovating? Here's what you need to know, in plain English.

  • Do I need ACT approval to renovate?

    Most exterior or structural work needs a Development Application and Building Approval through ACT Planning and Land Authority. Even some internal changes need sign-off. Check early or ask us and we will do it for you.
  • What will my renovation cost?

    Canberra averages: bathroom or kitchen twenty-five to fifty-five thousand, full home one hundred to three hundred plus. Always allow ten to fifteen per cent for surprises.
  • Will I need to move out during the renovation?

    You can stay during minor works. For anything structural or involving kitchens and bathrooms, moving out for a few weeks keeps the job faster, cleaner, and less stressful.
  • What areas add the most value if I plan to sell?

    Kitchens, bathrooms, and open-plan living spaces lift resale value. Energy upgrades like double glazing and insulation also pay back in running costs and buyer appeal.
  • Can I make my renovation more sustainable?

    Choose low-energy appliances, smart glazing, good insulation, and long-life materials. We can show the options that give the best return.
  • How long does a typical renovation take?

    Small jobs run three to six weeks. Major extensions or full home upgrades run three to five months, and a custom new build lands around eight to twelve months. Approval time is often the biggest variable, so start paperwork first.
  • Who should I speak with first, architect or builder?

    Simple cosmetic work: call a builder. Structural or layout changes: speak with an architect or designer, then involve the builder early to keep costs realistic.
  • How do I stop budget blow-outs?

    Lock your brief before work starts, open walls during planning to spot hidden issues, and keep a ten per cent contingency. We walk you through each step so nothing is missed.
  • Are there Canberra-specific rules I should know?

    Yes. Heritage precincts, tree protections, and strict setback rules can limit what you do. An early compliance check saves weeks later.
  • Can you help me plan my project?

    Yes. Book a free twenty-minute call and we will map approval steps, budget range, and timeline so you can move forward with confidence—no sales pressure.

Skip the ACT-approval paperwork

Book a free 20-minute call and we’ll map your approval pathway step by step—no pressure, just clarity. On the call we outline the exact approval path for your project, sanity-check your budget and timeline, and follow up with a brief email you can hand to any designer or builder.

Error. Your form has not been submittedEmoji
This is what the server says:
There must be an @ at the beginning.
I will retry
Reply
  • Direct builder line
  • No pressure
  • Fast answers

Prefer a quick chat?

Call Fady — the builder himself answers.

What We Do

From renovations to new builds, we deliver high-quality construction with a personal touch — you deal directly with the builder, every step of the way.

  • 1

    Renovations

    From kitchen and bathroom upgrades to full-home transformations — every renovation is finished with precision, care, and zero shortcuts.
    We manage everything, keep you informed, and make sure the end result feels like a brand-new space — without the stress.

    Step illustration
  • 2

    Extensions

    Running out of space? We design and build seamless extensions that blend with your home and meet your growing needs.
    No awkward add-ons or unfinished ideas — just clean, functional spaces designed to last.

    Step illustration
  • 3

    New Homes

    We’re taking on select custom builds for 2025. Built with care, clarity, and daily on-site presence — so you always know where things stand.
    You’ll work directly with the builder the whole way through — no middlemen, no miscommunication.

    Step illustration
  • 4

    Knockdown Rebuilds

    Love your block but not the house? We manage full knockdown rebuilds from demolition to handover — stress-free and fully compliant.
    We handle the paperwork, council approvals, and coordination so you can focus on the bigger picture.

    Step illustration